Rapid Delivery For Galvanized Scaffolding Parts - Metal Plank/Steel Plank: TJHY-SP3 – Huayou

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The corporate upholds the philosophy of Be No.1 in excellent, be rooted on credit rating and trustworthiness for growth, will keep on to serve outdated and new clients from home and abroad whole-heatedly for Types Of Scaffolding In Construction , Scaffolding Tubes , Scaffold Steel Ladder , We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
Rapid Delivery For Galvanized Scaffolding Parts - Metal Plank/Steel Plank: TJHY-SP3 – Huayou Detail:

What is scaffold plank / steel plank

Steel plank we also call them as metal plank, steel board, steel deck, metal deck, walk board, walk platform.

Size: 210*45mm, 240*45mm, 225*38mm, 250*50/40mm,300*50mm

Steel plank is a kind of scaffolding in the construction industry. The name of steel plank is based on the traditional scaffolding plank like wooden plank and bamboo plank. It is made by steel and generally referred as steel scaffold plank, steel building board, steel deck, galvanised plank, hot-dipped galvanised steel board, and is popularly used by the shipbuilding industry, the oil platform, the power industry and the construction industry. The steel plank is punched with M18 bolt holes for connecting the planks to other planks and adjusting the width of the bottom of the platform. Between the steel plank and other steel plank, use a toe board with a height of 180mm and painted black and yellow to fix the toe board with screws in 3 holes on steel plank so that the steel plank can be fixedly connected to other steel plank. After the connection is completed, the materials for the fabrication platform should be strictly checked for acceptance, and the platform should be tested after it is made. The installation is completed and acceptance is qualified for listing before it is put into use.

Steel plank can used in all type of scaffolding system and construction by different types.
Like the steel plank by size 210*45mm, 240*45mm, 225*38mm, 250*50/40mm,300*50mm. this kind of metal plank usually used with tubular system. It is placed on the scaffolding system which set up by scaffolding pipes and scaffolding couplers, and metal plank used in building scaffolding, marine offshore engineering, especially the shipbuilding scaffolding and oil&gas project.

The composition of steel plank

Steel plank consists of main plank, end cap and stiffener. The main plank punched with regular holes , then welded by two end cap at two sides and one stiffener by every 500mm. We can classified them by different sizes and also can by different type of stiffener, such as flat rib, box/square rib, v-rib.

Steel plank 210*45mm, 240*45mm, 250*50/40mm mostly welcomed by South East Asia market, the thickness is 1.0mm-1.2mm, and it is light weight and also save cost compare with other planks.

Basic information

1.Brand: Huayou

2.Materials: Q195, Q235 steel

3.Surface treatment: hot dipped galvanized , pre-galvanized

4.Production procedure: material—cut by size—welding with end cap and stiffener—surface treatment

5.Package: by bundle with steel strip

6.MOQ: 15Ton

7.Delivery time: 20-30days depends on the quantity

Size as following

Item

Width (mm)

Height (mm)

Thickness (mm)

Length (mm)

Stiffener

Metal Plank

210

45

1.0/1.1/1.1/1.5/1.8/2.0

1000

Flat/box/v-rib

210

45

1.0/1.1/1.1/1.5/1.8/2.0

2000

Flat/box/v-rib

210

45

1.0/1.1/1.1/1.5/1.8/2.0

3000

Flat/box/v-rib

210

45

1.0/1.1/1.1/1.5/1.8/2.0

4000

Flat/box/v-rib

240

45

1.0/1.1/1.1/1.5/1.8/2.0

1000

Flat/box/v-rib

240

45

1.0/1.1/1.1/1.5/1.8/2.0

2000

Flat/box/v-rib

240

45

1.0/1.1/1.1/1.5/1.8/2.0

3000

Flat/box/v-rib

240

45

1.0/1.1/1.1/1.5/1.8/2.0

4000

Flat/box/v-rib

250

50/40

1.0/1.1/1.1/1.5/1.8/2.0

1000

Flat/box/v-rib

250

50/40

1.0/1.1/1.1/1.5/1.8/2.0

2000

Flat/box/v-rib

250

50/40

1.0/1.1/1.1/1.5/1.8/2.0

3000

Flat/box/v-rib

250

50/40

1.0/1.1/1.1/1.5/1.8/2.0

4000

Flat/box/v-rib


Product detail pictures:

Rapid Delivery For Galvanized Scaffolding Parts - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Rapid Delivery For Galvanized Scaffolding Parts - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Rapid Delivery For Galvanized Scaffolding Parts - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Rapid Delivery For Galvanized Scaffolding Parts - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Rapid Delivery For Galvanized Scaffolding Parts - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Rapid Delivery For Galvanized Scaffolding Parts - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures


Related Product Guide:

The organization keeps for the procedure concept scientific administration, superior quality and effectiveness primacy, shopper supreme for Rapid Delivery For Galvanized Scaffolding Parts - Metal Plank/Steel Plank: TJHY-SP3 – Huayou , The product will supply to all over the world, such as: Tajikistan, Ecuador, Sydney, They're durable modeling and promoting effectively all over the world. Under no circumstances disappearing major functions in a quick time, it's a really should in your case of excellent good quality. Guided by the principle of Prudence, Efficiency, Union and Innovation. the company make a terrific efforts to expand its international trade, raise its company profit and raise its export scale. We're confident that we've been planning to possess a vibrant prospect and to be distributed all over the world within the years to come.
  • The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
    5 Stars By Gladys from Hungary - 2017.04.28 15:45
    The supplier cooperation attitude is very good, encountered various problems, always willing to cooperate with us, to us as the real God.
    5 Stars By Betsy from Azerbaijan - 2017.12.19 11:10