Good Quality Scaffolding - Telescopic painted galvanized light duty prop TJHY-PRP1 – Huayou

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our purpose would be to offer good quality products at competitive price ranges, and top-notch support to clients around the whole world. We're ISO9001, CE, and GS certified and strictly adhere to their good quality specifications for Adjustable Props , Adjustable Scaffold Props , Steel Scaffold Frame , We welcome new and aged buyers from all walks of daily life to get hold of us for upcoming business enterprise interactions and acquiring mutual good results!
Good Quality Scaffolding - Telescopic painted galvanized light duty prop TJHY-PRP1 – Huayou Detail:

Light duty prop is made by small sizes of scaffolding pipes, such as OD40/48mm, OD48/50mm for producing the inner pipe and outer pipe of scaffolding prop. The nut of light duty prop we call cup nut that the shape just like a cup. It is light weight compare with heavy duty prop and usually painted, pre-galvanized and electro-galvanized by surface treatment.

The production procedure of steel prop

You can find the best quality prop from Huayou, our every batch materials of prop will be inspected by our QC department and also tested according the quality standard and requirements by our customers.

The inner pipe is punched holes by laser machine instead of load machine that will be more accurate and our workers are experienced for 10years and improve the production processing technology time and time again. All our efforts in production of scaffolding make our products gained great reputation among our clients.

The features of steel prop

1.Simple and flexible

2.Easier assembling

3.High load capacity

4.Lower cost and economical

Light duty prop

Light duty prop is made by small sizes of scaffolding pipes, such as OD40/48mm, OD48/50mm for producing the inner pipe and outer pipe of scaffolding prop. The nut of ligh duty prop we call cup nut that the shape just like a cup. It is light weight compare with heavy duty prop and usually painted, pre-galvanized and electro-galvanized by surface treatment.

Basic information

1.Brand: Huayou

2.Materials: Q235, Q195, Q345 pipe

3.Surface treatment: hot dipped galvanized , electro-galvanized, pre-galvanized, painted, powder coated.

4.Production procedure: material—cut by size—punching hole—welding —surface treatment

5.Package: by bundle with steel strip or by pallet

6.MOQ: 15Ton

7.Delivery time: 20-30days depends on the quantity

Size as following

Item

Min.-Max.

Inner Tube

Outer Tube

Light Duty Prop

1.7-3.0m

40/48*1.8mm

48/56*1.8mm

1.8-3.2m

40/48*1.8mm

48/56*1.8mm

2.0-3.5m

40/48*1.8mm

48/56*1.8mm

2.2-3.9m

40/48*1.8mm

48/56*1.8mm


Product detail pictures:

Good Quality Scaffolding - Telescopic painted galvanized light duty prop TJHY-PRP1 – Huayou detail pictures

Good Quality Scaffolding - Telescopic painted galvanized light duty prop TJHY-PRP1 – Huayou detail pictures

Good Quality Scaffolding - Telescopic painted galvanized light duty prop TJHY-PRP1 – Huayou detail pictures


Related Product Guide:

To meet the customers' over-expected satisfaction , we have our strong team to provide our best overall service which includes marketing, sales, designing, production, quality controlling, packing, warehousing and logistics for Good Quality Scaffolding - Telescopic painted galvanized light duty prop TJHY-PRP1 – Huayou , The product will supply to all over the world, such as: Las Vegas, Ukraine, Guyana, We always insist on the principle of Quality and service are the life of the product. Till now, our products have been exported to more than 20 countries under our strict quality control and high level service.
  • It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
    5 Stars By Dolores from Houston - 2018.06.26 19:27
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Jerry from San Diego - 2017.04.18 16:45